CONNECTED MANUFACTURING · COMPLETE EXECUTION

From a plant problem
to a working solution.

Connect machines, people and business processes. Define the action, engineer the interfaces and prove the outcome on your shop floor.

EXPLORE THE ENGINEERING

Choose the workflow.
See what it takes to deliver.

These are illustrative solution pathways for scoping a project. Equipment compatibility, software selection, delivery capability and acceptance criteria are confirmed in Jantek’s proposal.

Production execution & OEE

Make every stoppage actionable.

Connect machine states and good/reject counts to shift calendars, work orders and agreed loss categories. Route downtime to an owner, then confirm the action taken.

Example, engineering scope & acceptance

Illustrative application

A packaging line repeatedly misses its shift target. Capture stoppages at the PLC, ask the operator for a reason and send recurring faults to maintenance.

From signal to action

PLC / counters → validated events → shift and order context → loss review → action tracking

What we define together

Machine signal list; state model; shift rules; order interfaces; loss codes; production reports.

How we check completion

Compare a supervised shift against manual counts; verify planned-time exclusions, stop durations and escalation routing.

Add this to your project scope

Traceability & process confirmation

Give each unit a verifiable history.

Link barcode or QR identity to component batches, station results and inspection records. Define rework routes and permissions before implementing release checks.

Example, engineering scope & acceptance

Illustrative application

An assembly needs evidence of torque and leak-test results before dispatch. Associate tool results with the serial number and flag missing or failed operations.

From signal to action

Scan identity → station validation → test result → genealogy record → release review

What we define together

Identifier rules; station matrix; retention needs; rework permissions; exception and recall search.

How we check completion

Replay duplicate scans, missing operations and failed tests; confirm a finished unit can be traced to its recorded components.

Add this to your project scope

Quality, vision & inspection

Connect inspection to the next decision.

Integrate gauges, test equipment or cameras with the production sequence. Record defects and route exceptions for review, with approved reject or rework handling.

Example, engineering scope & acceptance

Illustrative application

A packing station must verify the right label. Trial camera reading against real label variations and confirm how unreadable packs are handled.

From signal to action

Gauge / camera → measured result → quality rule → reject or review → evidence record

What we define together

Inspection criteria; sample parts; lighting trials; reject handling; quality records and review roles.

How we check completion

Test representative good and bad samples, unreadable codes and equipment disconnections against agreed acceptance limits.

Add this to your project scope

Maintenance & Andon escalation

Close the loop on equipment problems.

Turn equipment events into acknowledged issues, assigned actions and closure records. Combine operating-hour triggers with approved preventive-maintenance schedules.

Example, engineering scope & acceptance

Illustrative application

A conveyor trips intermittently. Notify the responsible team, capture the fault context and require a closure reason before marking the issue resolved.

From signal to action

Fault / runtime → event classification → assigned response → repair record → recurrence review

What we define together

Asset list; escalation matrix; maintenance tasks; spare references; response and closure workflow.

How we check completion

Verify duplicate alarm handling, escalation timers, acknowledgement and auditable closure of a trial fault.

Add this to your project scope

Energy & utility integration

Explain consumption in production context.

Bring power, compressed air, water or gas measurements together with output and operating states. Identify abnormal use and define who investigates each exception.

Example, engineering scope & acceptance

Illustrative application

Compressed-air use stays high during an idle shift. Compare consumption with machine state and assign a leak survey rather than assuming a saving.

From signal to action

Meter → gateway → timestamped readings → production context → investigation

What we define together

Meter survey; network design; unit and tariff configuration; baseline; exception thresholds.

How we check completion

Compare readings with source meters, test missing-data handling and reconcile the agreed consumption baseline.

Add this to your project scope

Operator guidance & digital instructions

Make the right sequence easier to follow.

Present approved work instructions by product and station. Capture checks and exceptions while keeping document revisions and access roles under control.

Example, engineering scope & acceptance

Illustrative application

A mixed-model line changes variants several times per shift. Select the correct setup instructions from the order and record the required checks.

From signal to action

Order / variant → approved instruction → operator confirmation → exception route → record

What we define together

Work sequence; document ownership; revision rules; language needs; operator roles and training.

How we check completion

Confirm the correct revision appears for each variant; verify skipped checks and unavailable instructions follow the agreed process.

Add this to your project scope

ERP, MES & shop-floor integration

Complete the transaction across systems.

Define the ownership of orders, materials, results and machine events. Use validated interfaces with retries, reconciliation and visible exception handling.

Example, engineering scope & acceptance

Illustrative application

Production confirmations are typed into ERP after every shift. Capture approved quantities once, send them through the agreed interface and reconcile rejected transactions.

From signal to action

ERP order → execution context → machine / operator result → validation → ERP confirmation

What we define together

Interface mapping; API permissions; identity model; buffering; retries; reconciliation and recovery plan.

How we check completion

Test duplicate messages, connection loss, restored connectivity and rejected transactions without double-counting.

Add this to your project scope

Automation, handling & retrofits

Make the physical process work end to end.

Coordinate mechanisms, drives, sensors, PLC/HMI logic and line interfaces with the operating sequence. Plan installation, commissioning and handover around plant constraints.

Example, engineering scope & acceptance

Illustrative application

A conveyor needs controlled accumulation and barcode routing. Define zone logic, downstream readiness and recovery before installation.

From signal to action

Product flow → sensors and drives → PLC sequence → line handoff → commissioning evidence

What we define together

Layout; load and throughput assumptions; I/O list; operating modes; risk review; FAT/SAT and training.

How we check completion

Prove agreed operating sequences, fault recovery and throughput under representative conditions. Safety functions require a separate qualified validation.

Add this to your project scope

ONE TEAM. CLEAR RESPONSIBILITIES.

Machines → controls → operations → enterprise.

The project includes the interfaces between layers: sensors and equipment, PLC and SCADA, manufacturing workflows, and MES or ERP. Discovery establishes access permissions, network separation, data ownership, recovery needs and the definition of done.

01

Survey & define

Document the process, signals, constraints and measurable acceptance criteria.

02

Engineer & integrate

Agree hardware, controls, software responsibilities and system interfaces.

03

Pilot & verify

Run representative tests, including exceptions and connectivity failures.

04

Commission & support

Deliver agreed documentation, operator training and support arrangements.

BUILD YOUR PROJECT SCOPE

What needs to work in your plant?

Select the workflows you need. Your choices carry into the project enquiry, where you can add basic details and download a project-definition PDF.

Choose one or more solution areas
View Jantek project examples

Your selections remain in this browser until you submit the project enquiry. No production-system connection is made here.